
Source: BAM
Project period
01/04/2023 - 31/12/2026
Project type
Individual research project
Project status
Ongoing
Description
The AGATO project is developing a system that combines aerial and ground robots to improve the monitoring and understanding of climate-harming methane emissions from wastewater treatment plants. Using laser absorption measurements and gas tomography, the system enables more precise detection and analysis of these emissions.
Location
Bundesanstalt für Materialforschung und -prüfung (BAM)
Unter den Eichen 87
12205 Berlin
Source: BAM
Source: BAM
Source: BAM
Source: BAM
Funding: The project is funded by the Federal Ministry for the Environment, Nature Conservation, Nuclear Safety and Consumer Protection (BMUV) and supported by the Federal Environment Agency (UBA).
The aim of the R&D project is to develop, construct, and validate a gastomographic measurement system using stationary and mobile sensors for emission monitoring in municipal wastewater treatment plants. Gastomography relies on integral concentration measurements from various viewing angles to reconstruct gas distribution. This project integrates stationary sensor networks with airborne and ground-based robotic systems into a single system.
For this purpose, open-path gas measurement technology based on Tunable Diode Laser Absorption Spectroscopy (TDLAS, primarily CH4 in ppm-m) and in-situ gas sensors (CH4, ppm) utilizing infrared absorption are employed. BAM's Department 8.1, leveraging its expertise in air and ground robotics, will develop a coordinated measurement data acquisition system for tomographic reconstruction. This includes the development, construction, and validation of the gastomographic measurement system's acquisition side, encompassing the development, integration, and programming of robotics, as well as the connection of gas sensors and stabilization systems (gimbals).
Additionally, significant development work will focus on the evaluation side, particularly the development and validation of gas tomography algorithms. The project will culminate in the validation of the measurement system through real-world measurements at wastewater treatment plants.
Partner
Potsdam sewage treatment plant as an associated partner
Funding
Federal Ministry for the Environment, Nature Conservation, Nuclear Safety and Consumer Protection (BMUV), FKZ 3721 41 304 1, technical support by Federal Environment Agency (UBA) FG III 2.6
Source: BMUV
Source: UBA