Main bridge

Main bridge Main bridgeThe sensor-based monitoring system was installed on a bridge over the river Main near Gemünden and tested during a load test with an 85-tonne electric locomotive: 82 sensors recorded deformations, strains, vibrations, and temperatures of the structure. Source: Bauhaus-Universität Weimar, Florian Madeya

DownloadBild