Paper of the month 25/2025: TF Infrastructure

Comparison of simulated and measured mass loss up to 700 °C for CEM I, CEM III/A and CEM II/B-Q at a heating rate of 10 K/min. Paper of the month 25/2025: TF InfrastructureComparison of simulated and measured mass loss up to 700 °C for CEM I, CEM III/A and CEM II/B-Q at a heating rate of 10 K/min. Source: BAM

DownloadBild