Shortcut to content

Expertise | Expert Information | Service | New | About BAM
Contact | © Disclaimer | Site Map | Search | Deutsch
Bundesadler



Content of the movie

Reinforcement of the carriageway of a highway bridge, resulting from the fusion of two radar data sets, displayed as a slice (depth = 5.5 cm) parallel to the surface in a depth of 5.5 cm

This movie shows consecutive depth slices (parallel to the carriageway). The visualised data set is based on the fusion of two radar data sets measured in two different directions of the antenna polarisation, perpendicular to each other. In a depth of 4 cm to 8 cm the reinforcement near the surface is clearly visible. The tendons, which do not run parallel to the surface, can be detected nearby the box girder wall in a depth of approx. 7.5 cm, whereas in the middle of the carriageway their position is approx. 8 cm deeper than it is near the wall. Directly behind the tendon the nominal reinforcement for the tendon and the reinforcement near the backside are visible in this area. The reflection of the backside could be detected in a depth of approx. 23 cm.

Animation-Download: 1.3 MB oder 560 KB (wmv)

Back to working area

2011-01-07  

top

Division 8.2

Division 8.2

Dr. rer. nat.
Herbert Wiggenhauser
Unter den Eichen 87
12205 Berlin
phone:
+49 30 8104-1440
email:
Herbert.Wiggenhauser@bam.de

Dipl.-Ing.
Doreen Streicher
Unter den Eichen 87
12205 Berlin
phone:
+49 30 8104-4211
email:
Doreen.Streicher@bam.de

 

 

How to find BAM